Risk Assessment for Hedge Planting in Neyotts Meadow

Location: Neyotts Meadow

 

Prepared by: Catriona Bass

Tel: 07816675460

Date Risk Assessment Prepared: 8 January 2025

Date of last Update: NA

 First Aid Leads

 Jodie Baker and Catriona Bass

 

 

Activities Expected

Activity

Hazards

Risk Level

Action – Risk Reduction Measure

Post Action Risk Level

Arrival at Site

Injury from Road Traffic

Med

Park vehicles in pavilion carpark - pavement to Neyotts

Low

Supervision

Badly supervised group leading to injury

Med

Appoint designated person to supervise and lead the work. Person should be able to call ambulance, experienced at supervising others, aware of the content of the risk assessment. Should issue instructions for the work in advance of the activity

First aid kit will be available via group leader

Low

Weather Conditions

Depending on time of year

Med

Warn all workers/volunteers in advance of works of the expected weather conditions

Low

 

Cold

Med

Reminder to bring warm clothing and extra layers if necessary

Low

 

Wet

Med

Reminder to bring waterproof clothing

Low

Machinery Operation

Injury from machinery

High

No machinery in use. Hand tools only

Low

Volunteers

Injury from hand tools

Med

Check all tools are in good condition before work starts. Avoid use of large-bladed tools such as axes, and machete Wearing of gloves recommended. Sturdy shoes with no open toes to be worn by all. To be checked on the day

Low

 

Working at heights

Low

No working at height expected

Low

 

Insect bites (unlikely at this time of year)

Low

For those with allergies they should be reminded to bring medication

Low

 

Injury from stinging nettles and brambles

Low

Identify any near to work areas and notify volunteers of location before work starts. For those with allergies they should be reminded to bring medication

Low

 

Increased risk to children

Med

All children (under 16) must be accompanied by an adult. Any first aid treatment must be done by the parent/guardian

Low

 

Trip hazards

High

Survey site prior to work starting, looking for holes in ground, sharp objects, barbed wire. Hazards to be removed or marked/closed off in advance of work starting

Low